Tuesday, September 25, 2012

The Mod to the Cross Brace


In order to get the Getrag 5 Speed trans that is currently attached to my Cummins 5.9 I had to cut the cross brace that is riveted to the frame rails right where the steering box is bolted. 1 minute with the plasma cutter and we had a notch. Once the engine and trans are in place there is plenty of clearance but notching the cross member was easier than cutting the rivets and bolting the whole thing back in. Fill pieces were cut and about 3 minutes with the mig welder and everything was good to go.


No comments:

Post a Comment